India, Russia in talks over Covid vaccine production

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Related stories

When to Bring in Outside Help for FDA Cybersecurity Compliance (and What to Look For)

Medical device cybersecurity has become too important to treat...

Billerud Introduces New Pharmaceutical Packaging Option

Billerud has officially introduced PharmaKraft, a specialized fibre-based packaging...

AstraZeneca Advances AI Drug Discovery Deal with insitro

AstraZeneca has inked a billion-dollar AI drug discovery partnership...
- Advertisement -

The Russian vaccine, called Sputnik V, was the first to be approved for use anywhere in the world even though it is yet to undergo safety and efficacy trials large groups of human volunteers – one of the most crucial steps before a vaccine candidate can be approved. Russian president Vladimir Putin said the shot is safe and effective.

India and Russia are in discussion for the potential production of a Covid-19 vaccine developed by Moscow’s Gamaleya institute, according to Union health secretary Rajesh Bhushan who said New Delhi has received some information about the candidate but detailed data is awaited.

The Russian vaccine, called Sputnik V, was the first to be approved for use anywhere in the world even though it is yet to undergo safety and efficacy trials large groups of human volunteers – one of the most crucial steps before a vaccine candidate can be approved. Russian president Vladimir Putin said the shot is safe and effective.

“As far as Sputnik V is concerned, both the countries (India and Russia) are in communication,” said Bhushan during the briefing on Covid-19 on Friday. “Some initial information has already been shared with us (by the Russian government), while some detailed information is awaited by us (from the Russian government),” he added.

India currently has three vaccine candidates against Covid-19 under various stages of human trials, and there are three vaccine candidates in pre-clinical stages, said director general of the Indian Council of Medical Research (ICMR), Dr Balram Bhargava.

Of the three vaccine manufacturers approved to conduct human trials in India, two are working on an indigenously developed candidate, while the third has been developed by Oxford University and British pharma firm AstraZeneca, which has struck a trials and production deal with Pune’s Serum Institute of India (SII).

“SII has begun phase 2/3 trials on 1,700 adult participants; Bharat Biotech’s vaccine candidate has completed phase 1 on about 375 participants, and Zydus Cadila’s phase I trial has also taken place in about 50 participants. The vaccine is given in two doses, and the second shot is usually given on either the 14th or 28th day after the first dose. After two-four weeks antibodies response is checked in blood,” said Dr Bhargava.

Around the world, there are 31 potential vaccine in human trials and the Oxford-AstraZeneca candidate is largely considered as the front runner along with the one by United States’s Moderna.

In India, SII has begun the phase II/III clinical trials at Bharati Vidyapeeth Deemed University Medical College and Hospital, Pune. “We have asked for about 300-350 vials of the Covishield vaccine being manufactured by Pune based Serum Institute of India,” said Dr Sanjay Lalwani, medical director, Bharati Vidyapeeth.

The vials arrived on Tuesday evening at the hospital at its Katraj campus, and the candidates will be administered the dose between 12 noon to 2 pm on Wednesday.

“Once the vials arrive, we will check the temperature logs of the vaccine. We have also called about 10 volunteers who will be tested for Covid and presence of antibodies on Wednesday morning. The eligibility criteria is that the person must be aged between 18-99 years without any comorbidities. Also, he or she has to be tested negative for the SARS-CoV-2 virus which causes Covid19 and test negative for the antibodies of the virus. So the person must not be currently or previously infected with Covid. Out of the 10 volunteers, whoever is deemed fit for the vaccination process will be vaccinated. They will be kept under a close check and after a week the next batch of volunteers will be vaccinated,” said Lalwani.

The hospital was earlier also part of Serum Institute’s research to determine if the recombinant Bacille Calmette-Guerian (BCG) vaccine can boost immunity to fight against the Covid19 virus which was a six months study.

SII is world’s largest vaccine manufacturer by number of doses produced and sold globally. On August 3, India’s drugs controller gave SII approval for phase II and III clinical trials.

The first make in India vaccine candidate by Bharat Biotech, Covaxin, received central drugs controller’s approval for phase I/II human trials on June 29. The vaccine candidate has been developed in collaboration with ICMR as its National Institute of Virology in Pune had isolated the SARS-CoV-2 strain that causes Covid-19, and transferred to Bharat Biotech in May.

Pharma major Zydus Cadila has also started phase 2 clinical trials to establish efficacy of its indigenously developed vaccine candidate, ZyCov-D. The phase 2 trial began on August 6.

“The vaccine will be ultimate to check the disease spread but we don’t know when will be an effective vaccine be available for use even though all our efforts are being directed towards making it happen as soon as possible. A good vaccine is the most cost-effective way of preventing a disease,” said Dr Amita Jain, head, microbiology department, KGMU, Lucknow (Uttar Pradesh).

Never miss a pharmaceutical headline

The pharmaceutical industry moves fast – stay on top of it with our must - read briefings.

  • The top pharma and life sciences stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments driving the global pharmaceutical sector

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Latest stories

Related stories

When to Bring in Outside Help for FDA Cybersecurity Compliance (and What to Look For)

Medical device cybersecurity has become too important to treat...

Billerud Introduces New Pharmaceutical Packaging Option

Billerud has officially introduced PharmaKraft, a specialized fibre-based packaging...

AstraZeneca Advances AI Drug Discovery Deal with insitro

AstraZeneca has inked a billion-dollar AI drug discovery partnership...

Managing Quality and Regulatory Risks in Pharmaceutical Technology Transfer

Technology transfer moves more than manufacturing instructions. It moves process knowledge, supplier dependencies, labeling requirements, packaging specifications, and the evidence needed to demonstrate control. For medical device manufacturers, including those supporting drug-device combination products, these interfaces can become recurring sources of compliance gaps during site transitions, acquisitions, and remediation. The central problem is often not a missing procedure. It is a quality system that allows connected activities to change independently. A label revision may be approved while packaging artwork, supplier instructions, or production-system data still reflect an obsolete version. Staying inspection-ready requires manufacturers to manage these dependencies as one controlled system. Why Compliance Gaps Keep Recurring Findings are treated as documentation defects Revising a procedure can resolve an immediate discrepancy without changing the behavior that caused it. If unclear decision rights, weak escalation, or ineffective training remain, the same failure may surface elsewhere. Corrective and preventive action should distinguish the observed finding from its underlying cause and establish how effectiveness will be demonstrated. Ownership is divided across connected functions Quality, Regulatory Affairs, labeling, packaging engineering, operations, suppliers, and digital-system owners often maintain separate workflows. Each team may complete its assigned task while an interface remains uncontrolled. For example, changing an instruction for use can affect packaging configuration, translations, technical documentation, inventory disposition, and release controls. Transitions expose unresolved weaknesses Acquisitions and site transfers can introduce conflicting procedures, incomplete knowledge transfer, or different assumptions about validated processes. Regulatory changes add further demands. When these events coincide with CAPA or change-control backlogs, teams may prioritize administrative closure over risk reduction. Without a coordinated impact assessment, local fixes can create new gaps downstream. Establish the Regulatory Baseline Inspection readiness starts with knowing which requirements apply to the product, activity, and market. Pharmaceutical, device, and combination-product obligations are not interchangeable; transfer planning should identify the applicable requirements rather than assume one quality framework covers every operation. According to FDA’s Quality Management System Regulation overview and FAQs, the QMSR became effective on February 2, 2026, incorporates ISO 13485:2016 by reference, and introduced the updated device inspection process under Compliance Program 7382.850. ISO 13485 certification does not exempt a manufacturer from FDA inspection or guarantee compliance with FDA requirements. For devices marketed in the European Union, Regulation (EU) 2017/745, Annex I, Section 23, provides the primary requirements for information supplied with devices, including labels and instructions for use. Teams should assess the applicable provisions alongside relevant language, product-specific, and market requirements. A labeling review should therefore evaluate required content and consistency with the device’s intended purpose and supporting documentation—not merely artwork accuracy. How to Identify the Real Gaps Begin with a cross-functional assessment that follows actual product and information flows. Select representative transfers, label changes, supplier changes, and CAPAs, then trace each from initiation through implementation and effectiveness review. Map dependencies: Identify affected specifications, suppliers, packaging components, systems, validation activities, and training. Compare records with practice: Check whether approved procedures match what operators and reviewers actually do. Test traceability: Follow a requirement through technical documentation, labeling, production instructions, and release evidence. Examine recurrence: Look for repeated deviations, reopened actions, overdue changes, and findings shared across sites. Assess capacity: Determine whether qualified owners have enough time and authority to complete corrective work. Prioritize gaps by potential patient or user harm, regulatory impact, likelihood of recurrence, and detectability. Document the rationale; an old overdue item is not automatically more important than a newly identified high-risk weakness. Align Quality, Labeling, Packaging, and Change Control Create a coordinated remediation plan with one accountable owner for each action, named contributors, acceptance criteria, and required evidence. Separate immediate containment from systemic correction. Containment might prevent obsolete labels from being issued; correction might redesign approval and implementation controls so obsolete versions cannot return. Use change control as the integration point. Before approval, evaluate effects on regulatory submissions or notifications, technical documentation, supplier controls, packaging performance, validation, electronic master data, inventory, and training. Record both identified impacts and justified decisions that particular activities are unaffected. During technology transfer, define readiness gates before production or release responsibilities move. These should address the transfer of process knowledge, acceptance criteria, receiving-site capability, required qualification or validation, approved documents, and personnel competence. The appropriate evidence depends on the product and process; a generic checklist cannot replace a documented assessment. Finally, verify implementation where the work happens. Confirm that current instructions are available, suppliers received approved requirements, systems contain correct versions, and affected personnel can perform their tasks. A signed approval is not evidence that every downstream change took effect. Mistakes That Undermine Inspection Readiness Closing CAPAs on task completion alone: Effectiveness checks should test whether the underlying failure has been controlled. Updating labels in isolation: Assess packaging, supplier, system, documentation, and inventory consequences. Counting closures instead of evidence: Dashboards need defensible records behind their status indicators. ...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access theMedia Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »