Cathay Cargo signs Global Airline Partnership with Tower Cold Chain

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Related stories

Optimizing Pouch Closure Performance through Advanced Sealant Layer Design

The pharmaceutical industry relies heavily on the physical integrity...

Billerud Introduces New Pharmaceutical Packaging Option

Billerud has officially introduced PharmaKraft, a specialized fibre-based packaging...

AstraZeneca Advances AI Drug Discovery Deal with insitro

AstraZeneca has inked a billion-dollar AI drug discovery partnership...
- Advertisement -

Cathay Cargo has signed a global long-term rental agreement with Tower Cold Chain, giving its customers access to a wider range of temperature-controlled solutions in terms of container size and payload volume.

Ideal for the transportation of life-saving pharmaceutical, biotech and life-science products, Tower’s robust, reliable, reusable solutions are a welcomed addition to Cathay Cargo’s cool container pharmaceutical portfolio.

Allowing the airline to extend its range of container choice, Cathay Pharma customers will have increased flexibility and variety when shipping high-value, temperature-sensitive products in both Euro or US pallet sizes.

This new partnership means customers can access and order Tower’s passive cold chain solutions 24/7 online, either via the Tower website or through Cathay’s booking service. and benefit from 120+ hour protection for products that require an internal temperature of -80°C (ultracold), -60°C (ultracold), -20°C (frozen), +5°C (refrigerated) and +20°C (controlled room temperature).

Available in a comprehensive variety of sizes and volumes, Tower’s containers cover internal payloads ranging from 3075 litres down to 26.4 litres – The KTEvolution, the company’s first hand-held container, ideal for small-batch, direct-to-patient shipments.

This long-term deal coincides with the airline’s rebrand. Previously known as Cathay Pacific Cargo, the rebrand reinforces Cathay’s vision to become one of the world’s greatest service brands and to provide sector-specific expertise and innovative solutions to its customers.

As Tower’s first global airline service agreement, the partnership marks a new watershed in the company’s own rapidly growing reputation. Utilising phase-change materials (PCMs), Tower’s patented design technology guarantees safe temperature-controlled transportation without the need for electricity or human intervention, providing the agility, safety and consistency today’s pharmaceutical supply chains demand. The fully reusable containers, and the option for customers to select a dry-ice free solution for temperatures from -40°C to +40 °C also support Tower and Cathay’s commitment towards sustainability.

Tower containers are available globally via its network of strategic hubs at major airports – a key selling point for Cathay Cargo, as it enables greater proximity and availability for customers, in over 70 destinations worldwide.

“We are delighted to partner with Tower Cold Chain to further enhance our Cathay Pharma portfolio with more choices and innovative solutions to our customers in the pharmaceutical, biotech, and life-science industries. Tower’s advanced passive containers deliver proven physical and temperature protection, across all supply chains. This, coupled with Cathay Cargo’s vast distribution network will benefit our customers and, ultimately, their patients around the world,” said Frosti Lau, General Manager Cargo Service Delivery, Cathay Cargo.

“Partnering with a world-class airline like Cathay Cargo ensures their pharmaceutical customers are supported with reliable and seamless temperature-controlled solutions,” said Niall Balfour, Chief Executive of Tower Cold Chain.

“As our first official airline agreement, this project allows a multitude of customers to lease Tower Cold Chain’s reliable containers directly from Cathay Cargo, providing a robust system for safe and seamless transportation of temperature sensitive products to patients on time and on budget. We look forward to working together to transport time-critical and temperature sensitive pharmaceuticals around the world on our global network.”

 

Never miss a pharmaceutical headline

The pharmaceutical industry moves fast – stay on top of it with our must - read briefings.

  • The top pharma and life sciences stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments driving the global pharmaceutical sector

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Latest stories

Related stories

Optimizing Pouch Closure Performance through Advanced Sealant Layer Design

The pharmaceutical industry relies heavily on the physical integrity...

Billerud Introduces New Pharmaceutical Packaging Option

Billerud has officially introduced PharmaKraft, a specialized fibre-based packaging...

AstraZeneca Advances AI Drug Discovery Deal with insitro

AstraZeneca has inked a billion-dollar AI drug discovery partnership...

Managing Quality and Regulatory Risks in Pharmaceutical Technology Transfer

Technology transfer moves more than manufacturing instructions. It moves process knowledge, supplier dependencies, labeling requirements, packaging specifications, and the evidence needed to demonstrate control. For medical device manufacturers, including those supporting drug-device combination products, these interfaces can become recurring sources of compliance gaps during site transitions, acquisitions, and remediation. The central problem is often not a missing procedure. It is a quality system that allows connected activities to change independently. A label revision may be approved while packaging artwork, supplier instructions, or production-system data still reflect an obsolete version. Staying inspection-ready requires manufacturers to manage these dependencies as one controlled system. Why Compliance Gaps Keep Recurring Findings are treated as documentation defects Revising a procedure can resolve an immediate discrepancy without changing the behavior that caused it. If unclear decision rights, weak escalation, or ineffective training remain, the same failure may surface elsewhere. Corrective and preventive action should distinguish the observed finding from its underlying cause and establish how effectiveness will be demonstrated. Ownership is divided across connected functions Quality, Regulatory Affairs, labeling, packaging engineering, operations, suppliers, and digital-system owners often maintain separate workflows. Each team may complete its assigned task while an interface remains uncontrolled. For example, changing an instruction for use can affect packaging configuration, translations, technical documentation, inventory disposition, and release controls. Transitions expose unresolved weaknesses Acquisitions and site transfers can introduce conflicting procedures, incomplete knowledge transfer, or different assumptions about validated processes. Regulatory changes add further demands. When these events coincide with CAPA or change-control backlogs, teams may prioritize administrative closure over risk reduction. Without a coordinated impact assessment, local fixes can create new gaps downstream. Establish the Regulatory Baseline Inspection readiness starts with knowing which requirements apply to the product, activity, and market. Pharmaceutical, device, and combination-product obligations are not interchangeable; transfer planning should identify the applicable requirements rather than assume one quality framework covers every operation. According to FDA’s Quality Management System Regulation overview and FAQs, the QMSR became effective on February 2, 2026, incorporates ISO 13485:2016 by reference, and introduced the updated device inspection process under Compliance Program 7382.850. ISO 13485 certification does not exempt a manufacturer from FDA inspection or guarantee compliance with FDA requirements. For devices marketed in the European Union, Regulation (EU) 2017/745, Annex I, Section 23, provides the primary requirements for information supplied with devices, including labels and instructions for use. Teams should assess the applicable provisions alongside relevant language, product-specific, and market requirements. A labeling review should therefore evaluate required content and consistency with the device’s intended purpose and supporting documentation—not merely artwork accuracy. How to Identify the Real Gaps Begin with a cross-functional assessment that follows actual product and information flows. Select representative transfers, label changes, supplier changes, and CAPAs, then trace each from initiation through implementation and effectiveness review. Map dependencies: Identify affected specifications, suppliers, packaging components, systems, validation activities, and training. Compare records with practice: Check whether approved procedures match what operators and reviewers actually do. Test traceability: Follow a requirement through technical documentation, labeling, production instructions, and release evidence. Examine recurrence: Look for repeated deviations, reopened actions, overdue changes, and findings shared across sites. Assess capacity: Determine whether qualified owners have enough time and authority to complete corrective work. Prioritize gaps by potential patient or user harm, regulatory impact, likelihood of recurrence, and detectability. Document the rationale; an old overdue item is not automatically more important than a newly identified high-risk weakness. Align Quality, Labeling, Packaging, and Change Control Create a coordinated remediation plan with one accountable owner for each action, named contributors, acceptance criteria, and required evidence. Separate immediate containment from systemic correction. Containment might prevent obsolete labels from being issued; correction might redesign approval and implementation controls so obsolete versions cannot return. Use change control as the integration point. Before approval, evaluate effects on regulatory submissions or notifications, technical documentation, supplier controls, packaging performance, validation, electronic master data, inventory, and training. Record both identified impacts and justified decisions that particular activities are unaffected. During technology transfer, define readiness gates before production or release responsibilities move. These should address the transfer of process knowledge, acceptance criteria, receiving-site capability, required qualification or validation, approved documents, and personnel competence. The appropriate evidence depends on the product and process; a generic checklist cannot replace a documented assessment. Finally, verify implementation where the work happens. Confirm that current instructions are available, suppliers received approved requirements, systems contain correct versions, and affected personnel can perform their tasks. A signed approval is not evidence that every downstream change took effect. Mistakes That Undermine Inspection Readiness Closing CAPAs on task completion alone: Effectiveness checks should test whether the underlying failure has been controlled. Updating labels in isolation: Assess packaging, supplier, system, documentation, and inventory consequences. Counting closures instead of evidence: Dashboards need defensible records behind their status indicators. ...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access theMedia Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »