Close

DCPrime and apceth Biopharma GmbH Announce Manufacturing Partnership

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Related stories

Billerud Introduces New Pharmaceutical Packaging Option

Billerud has officially introduced PharmaKraft, a specialized fibre-based packaging...

AstraZeneca Advances AI Drug Discovery Deal with insitro

AstraZeneca has inked a billion-dollar AI drug discovery partnership...

Managing Quality and Regulatory Risks in Pharmaceutical Technology Transfer

Technology transfer moves more than manufacturing instructions. It moves process knowledge, supplier dependencies, labeling requirements, packaging specifications, and the evidence needed to demonstrate control. For medical device manufacturers, including those supporting drug-device combination products, these interfaces can become recurring sources of compliance gaps during site transitions, acquisitions, and remediation. The central problem is often not a missing procedure. It is a quality system that allows connected activities to change independently. A label revision may be approved while packaging artwork, supplier instructions, or production-system data still reflect an obsolete version. Staying inspection-ready requires manufacturers to manage these dependencies as one controlled system. Why Compliance Gaps Keep Recurring Findings are treated as documentation defects Revising a procedure can resolve an immediate discrepancy without changing the behavior that caused it. If unclear decision rights, weak escalation, or ineffective training remain, the same failure may surface elsewhere. Corrective and preventive action should distinguish the observed finding from its underlying cause and establish how effectiveness will be demonstrated. Ownership is divided across connected functions Quality, Regulatory Affairs, labeling, packaging engineering, operations, suppliers, and digital-system owners often maintain separate workflows. Each team may complete its assigned task while an interface remains uncontrolled. For example, changing an instruction for use can affect packaging configuration, translations, technical documentation, inventory disposition, and release controls. Transitions expose unresolved weaknesses Acquisitions and site transfers can introduce conflicting procedures, incomplete knowledge transfer, or different assumptions about validated processes. Regulatory changes add further demands. When these events coincide with CAPA or change-control backlogs, teams may prioritize administrative closure over risk reduction. Without a coordinated impact assessment, local fixes can create new gaps downstream. Establish the Regulatory Baseline Inspection readiness starts with knowing which requirements apply to the product, activity, and market. Pharmaceutical, device, and combination-product obligations are not interchangeable; transfer planning should identify the applicable requirements rather than assume one quality framework covers every operation. According to FDA’s Quality Management System Regulation overview and FAQs, the QMSR became effective on February 2, 2026, incorporates ISO 13485:2016 by reference, and introduced the updated device inspection process under Compliance Program 7382.850. ISO 13485 certification does not exempt a manufacturer from FDA inspection or guarantee compliance with FDA requirements. For devices marketed in the European Union, Regulation (EU) 2017/745, Annex I, Section 23, provides the primary requirements for information supplied with devices, including labels and instructions for use. Teams should assess the applicable provisions alongside relevant language, product-specific, and market requirements. A labeling review should therefore evaluate required content and consistency with the device’s intended purpose and supporting documentation—not merely artwork accuracy. How to Identify the Real Gaps Begin with a cross-functional assessment that follows actual product and information flows. Select representative transfers, label changes, supplier changes, and CAPAs, then trace each from initiation through implementation and effectiveness review. Map dependencies: Identify affected specifications, suppliers, packaging components, systems, validation activities, and training. Compare records with practice: Check whether approved procedures match what operators and reviewers actually do. Test traceability: Follow a requirement through technical documentation, labeling, production instructions, and release evidence. Examine recurrence: Look for repeated deviations, reopened actions, overdue changes, and findings shared across sites. Assess capacity: Determine whether qualified owners have enough time and authority to complete corrective work. Prioritize gaps by potential patient or user harm, regulatory impact, likelihood of recurrence, and detectability. Document the rationale; an old overdue item is not automatically more important than a newly identified high-risk weakness. Align Quality, Labeling, Packaging, and Change Control Create a coordinated remediation plan with one accountable owner for each action, named contributors, acceptance criteria, and required evidence. Separate immediate containment from systemic correction. Containment might prevent obsolete labels from being issued; correction might redesign approval and implementation controls so obsolete versions cannot return. Use change control as the integration point. Before approval, evaluate effects on regulatory submissions or notifications, technical documentation, supplier controls, packaging performance, validation, electronic master data, inventory, and training. Record both identified impacts and justified decisions that particular activities are unaffected. During technology transfer, define readiness gates before production or release responsibilities move. These should address the transfer of process knowledge, acceptance criteria, receiving-site capability, required qualification or validation, approved documents, and personnel competence. The appropriate evidence depends on the product and process; a generic checklist cannot replace a documented assessment. Finally, verify implementation where the work happens. Confirm that current instructions are available, suppliers received approved requirements, systems contain correct versions, and affected personnel can perform their tasks. A signed approval is not evidence that every downstream change took effect. Mistakes That Undermine Inspection Readiness Closing CAPAs on task completion alone: Effectiveness checks should test whether the underlying failure has been controlled. Updating labels in isolation: Assess packaging, supplier, system, documentation, and inventory consequences. Counting closures instead of evidence: Dashboards need defensible records behind their status indicators. ...
- Advertisement -

DCPrime BV, a clinical stage company developing dendritic cell vaccines to treat cancer, and apceth Biopharma GmbH, an established contract manufacturing organization in the field of gene and cell therapy, report today that they have entered into a strategic manufacturing agreement.

The collaboration involves clinical batch production and the development of a commercial scale manufacturing process of cancer vaccines based on DCPrime’s technology platform DCOne®. The companies also announce that apceth has recently successfully passed an inspection by the District Government of Upper Bavaria and the Paul-Ehrlich-Institute for the manufacturing license for production of DCP-001, DCPrime’s lead program. This will enable DCPrime to enter into a Phase II Proof of Concept study in Acute Myeloid Leukemia.

“Precisely because our platform allows, for the first time, production of dendritic cell vaccines in an off-the-shelf manner, and bypasses the costly and complicated manufacturing procedures of patient-derived dendritic cell vaccines, it is crucial for DCPrime to partner with apceth Biopharma, an experienced contract manufacturing company. This collaboration will be instrumental in bringing our innovative therapies to as many patients as possible”, says Dr Ada Kruisbeek, founder and CEO & CSO of DCPrime.

“We are pleased that our manufacturing relationship with DCPrime has started in such a successful manner and that after only one year, we can already ensure production of clinical batches and product supply to patients for further development of the first off-the-shelf dendritic cell vaccine to enter Phase II clinical studies”, says Dr Christine Guenther, apceth Biopharma’s CEO. “We at apceth are also very pleased that we will continue our relationship in the future, to enable large scale production and therefore product supply to even larger numbers of cancer patients”.

“It has been a pleasure working with the professional staff of apceth Biopharma during the early phases of technology transfer of our current production process, and we look forward to the next steps with respect to developing a commercial scale manufacturing process”, says Dr Sandra van Wetering, COO of DCPrime.

About DCPrime
DCPrime’s is a privately owned, clinical stage biotechnology company focused on developing therapeutic, dendritic cell-based cancer vaccines. DCPrime’s technology platform is based on the DCOne® cell line, which is derived from myeloid leukemia cells and expresses a number of validated tumor antigens. This makes the platform suitable for application in patients with myeloid and other hematological cancers. In addition, DCOne® cells can be loaded with tumor associated antigens of choice, to develop cancer-specific vaccine formulations for multiple other (solid) cancer types. The company’s lead product DCP-001 is positioned as a consolidation vaccine therapy in Acute Myeloid Leukemia (AML). A Phase I/IIa study with this product has been completed and shows that DCP-001 is a safe product that induces a clear anti-tumor response in patients, and strong survival improvement in several of the studied patients. DCPrime received orphan drug designation in AML for this product from the EMA and is currently preparing a multi-center Phase II trial to demonstrate efficacy in AML patients.

About apceth Biopharma GmbH
apceth Biopharma is a leading company in cell-based gene therapeutics with an innovative portfolio of drug candidates for the treatment of chronic inflammation, autoimmunity (immunomodulation) and solid cancer (immuno-oncology). Through introduction of different therapeutic transgenes into MSCs, apceth is developing two potent next generation MSC-based gene therapy products. apceth-201 expresses the immunomodulatory protein Alpha-1 Antitrypsin for the treatment of Graft-vs-Host-Disease. The company’s second program, apceth-301, expresses a potent immuno-stimulatory “cocktail” of cytokines which locally activates the immune system to eradicate tumor cells. apceth-301 is currently being developed for Glioblastoma.

apceth is also an experienced and certified Contract Development & Manufacturing Organization for Advanced Therapy Medicinal Products (ATMPs) with a high international reputation for professionalism, quality and reliability. The company has state-of-the-art manufacturing facilities (ISO5, ISO7, ISO8, BSL2 cleanrooms), is certified for GMP production, and has an extensive quality management system, allowing apceth to ensure full regulatory compliance as well as the utmost GMP and quality standards according to regulatory requirements for ATMPs. apceth has successfully obtained multiple manufacturing licenses for different types of native and genetically engineered cells and cell-based products. apceth was the first company worldwide to obtain approval for the clinical testing of genetically engineered MSCs in patients. Irrespectively of the type of cells and cell products (native or genetically engineered HSC, MSC, and immune cells), or the cell source, apceth provides fully customized solutions in the development and production of every customer product and process. Located centrally in the heart of Europe, apceth can perform efficient and fast supply of the client’s products across the continent.

Contacts
apceth Biopharma
Dr Christine Guenther, CEO
Max-Lebsche-Platz 30
81377 Munich
Germany
+49 (0)89 7009608 0
contact@apceth.com
www.apceth.com

For DCPrime
Dr Ada M. Kruisbeek
Galileiweg 8
2333 BD Leiden
The Netherlands
+ 31 (0)6-551 72 158
a.kruisbeek@dcprime.nl
www.dcprime.nl

Never miss a pharmaceutical headline

The pharmaceutical industry moves fast – stay on top of it with our must - read briefings.

  • The top pharma and life sciences stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments driving the global pharmaceutical sector

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Latest stories

Related stories

Billerud Introduces New Pharmaceutical Packaging Option

Billerud has officially introduced PharmaKraft, a specialized fibre-based packaging...

AstraZeneca Advances AI Drug Discovery Deal with insitro

AstraZeneca has inked a billion-dollar AI drug discovery partnership...

Managing Quality and Regulatory Risks in Pharmaceutical Technology Transfer

Technology transfer moves more than manufacturing instructions. It moves process knowledge, supplier dependencies, labeling requirements, packaging specifications, and the evidence needed to demonstrate control. For medical device manufacturers, including those supporting drug-device combination products, these interfaces can become recurring sources of compliance gaps during site transitions, acquisitions, and remediation. The central problem is often not a missing procedure. It is a quality system that allows connected activities to change independently. A label revision may be approved while packaging artwork, supplier instructions, or production-system data still reflect an obsolete version. Staying inspection-ready requires manufacturers to manage these dependencies as one controlled system. Why Compliance Gaps Keep Recurring Findings are treated as documentation defects Revising a procedure can resolve an immediate discrepancy without changing the behavior that caused it. If unclear decision rights, weak escalation, or ineffective training remain, the same failure may surface elsewhere. Corrective and preventive action should distinguish the observed finding from its underlying cause and establish how effectiveness will be demonstrated. Ownership is divided across connected functions Quality, Regulatory Affairs, labeling, packaging engineering, operations, suppliers, and digital-system owners often maintain separate workflows. Each team may complete its assigned task while an interface remains uncontrolled. For example, changing an instruction for use can affect packaging configuration, translations, technical documentation, inventory disposition, and release controls. Transitions expose unresolved weaknesses Acquisitions and site transfers can introduce conflicting procedures, incomplete knowledge transfer, or different assumptions about validated processes. Regulatory changes add further demands. When these events coincide with CAPA or change-control backlogs, teams may prioritize administrative closure over risk reduction. Without a coordinated impact assessment, local fixes can create new gaps downstream. Establish the Regulatory Baseline Inspection readiness starts with knowing which requirements apply to the product, activity, and market. Pharmaceutical, device, and combination-product obligations are not interchangeable; transfer planning should identify the applicable requirements rather than assume one quality framework covers every operation. According to FDA’s Quality Management System Regulation overview and FAQs, the QMSR became effective on February 2, 2026, incorporates ISO 13485:2016 by reference, and introduced the updated device inspection process under Compliance Program 7382.850. ISO 13485 certification does not exempt a manufacturer from FDA inspection or guarantee compliance with FDA requirements. For devices marketed in the European Union, Regulation (EU) 2017/745, Annex I, Section 23, provides the primary requirements for information supplied with devices, including labels and instructions for use. Teams should assess the applicable provisions alongside relevant language, product-specific, and market requirements. A labeling review should therefore evaluate required content and consistency with the device’s intended purpose and supporting documentation—not merely artwork accuracy. How to Identify the Real Gaps Begin with a cross-functional assessment that follows actual product and information flows. Select representative transfers, label changes, supplier changes, and CAPAs, then trace each from initiation through implementation and effectiveness review. Map dependencies: Identify affected specifications, suppliers, packaging components, systems, validation activities, and training. Compare records with practice: Check whether approved procedures match what operators and reviewers actually do. Test traceability: Follow a requirement through technical documentation, labeling, production instructions, and release evidence. Examine recurrence: Look for repeated deviations, reopened actions, overdue changes, and findings shared across sites. Assess capacity: Determine whether qualified owners have enough time and authority to complete corrective work. Prioritize gaps by potential patient or user harm, regulatory impact, likelihood of recurrence, and detectability. Document the rationale; an old overdue item is not automatically more important than a newly identified high-risk weakness. Align Quality, Labeling, Packaging, and Change Control Create a coordinated remediation plan with one accountable owner for each action, named contributors, acceptance criteria, and required evidence. Separate immediate containment from systemic correction. Containment might prevent obsolete labels from being issued; correction might redesign approval and implementation controls so obsolete versions cannot return. Use change control as the integration point. Before approval, evaluate effects on regulatory submissions or notifications, technical documentation, supplier controls, packaging performance, validation, electronic master data, inventory, and training. Record both identified impacts and justified decisions that particular activities are unaffected. During technology transfer, define readiness gates before production or release responsibilities move. These should address the transfer of process knowledge, acceptance criteria, receiving-site capability, required qualification or validation, approved documents, and personnel competence. The appropriate evidence depends on the product and process; a generic checklist cannot replace a documented assessment. Finally, verify implementation where the work happens. Confirm that current instructions are available, suppliers received approved requirements, systems contain correct versions, and affected personnel can perform their tasks. A signed approval is not evidence that every downstream change took effect. Mistakes That Undermine Inspection Readiness Closing CAPAs on task completion alone: Effectiveness checks should test whether the underlying failure has been controlled. Updating labels in isolation: Assess packaging, supplier, system, documentation, and inventory consequences. Counting closures instead of evidence: Dashboards need defensible records behind their status indicators. ...

State of API & Peptide CDMO Capacity

Pharmaceutical companies planning peptide or complex small-molecule launches are...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access theMedia Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »