Close

Catalent to Acquire Cell Therapy Manufacturing Facility from Bone Therapeutics

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Related stories

When to Bring in Outside Help for FDA Cybersecurity Compliance (and What to Look For)

Medical device cybersecurity has become too important to treat...

Billerud Introduces New Pharmaceutical Packaging Option

Billerud has officially introduced PharmaKraft, a specialized fibre-based packaging...

AstraZeneca Advances AI Drug Discovery Deal with insitro

AstraZeneca has inked a billion-dollar AI drug discovery partnership...
- Advertisement -

Catalent, the leading global provider of advanced delivery technologies, development, and manufacturing solutions for drugs, biologics, cell and gene therapies, and consumer health products,  announced that it had signed an agreement with Bone Therapeutics to acquire its cell therapy manufacturing subsidiary, Skeletal Cell Therapy Support SA (SCTS), including all of its assets located in Gosselies, Belgium. The transaction is expected to close in November 2020.

Under the terms of the agreement, Catalent will purchase the shares of SCTS, currently held by Bone Therapeutics, which owns and operates a purpose-built CGxP facility of approximately 41,000 square-foot (3,800 square-meter), including its related quality control and product development laboratories, warehouse, grade C and B cleanrooms and equipment as well as land for further development. Catalent will undertake the manufacturing of clinical material for Bone Therapeutics’ drug, ALLOB, an allogeneic osteoblastic cell therapy product, derived from ex vivo cultured bone marrow cells.

The Bone Therapeutics subsidiary and its facility, which is next to Catalent’s existing cell therapy site, will allow Catalent to expand its industry-leading cell therapy capabilities and advanced clinical and commercial supply, and create an integrated European center of excellence in cell therapy. Catalent is continuing work on its dedicated 60,000 square-foot (5,574 square-meter) commercial-scale production and fill-finish facility in Gosselies, which is scheduled to be completed by the end of 2021.

As part of the acquisition, all of the experienced manufacturing employees located in Gosselies and employed by SCTS will remain with SCTS and become part of the Catalent workforce, and Bone Therapeutics will continue to focus on its pipeline of unique, innovative products addressing high unmet medical needs in the fields of orthopedics and bone diseases.

“Catalent is committed to supporting the development and manufacture of next-generation therapies and bringing life-changing treatments to patients in need,” commented Manja Boerman, Ph.D., President, Catalent Cell & Gene Therapy. “Following the acquisition of MaSTherCell, the additional manufacturing capacity and technical expertise that this deal with Bone Therapeutics gives us will immediately expand our functional clinical and commercial capacity for current late-stage customers. This addition also creates a strong center of cell therapy excellence for Catalent in Europe and will serve as a hub for the growing cell therapy pipeline.”

“This agreement with Catalent is an important strategic step for Bone Therapeutics and is the result of our continuous effort to optimize our operations,” said Miguel Forte, CEO, Bone Therapeutics. “The integration of our manufacturing subsidiary into Catalent, one of the premier contract manufacturers in the cell therapy space, significantly increases our operational flexibility. It enables Bone Therapeutics to maximize the efficient use of our manufacturing assets by combining the manufacturing facility and specialist operators with Catalent’s global network of clinical and commercial manufacturing facilities. This will ensure the most efficient ongoing global production of ALLOB. It also allows us to further focus on our core activity: developing innovative cell-based treatments for conditions with high unmet medical needs. This deal will facilitate our efforts to bring ALLOB more quickly within the reach of patients around the world.”

In addition to the expansion in Gosselies, validation of Catalent’s new 32,000 square-foot (3,000 square-meter) cell therapy development facility in Houston, Texas is underway and scheduled to be completed by the end of 2020.
About Catalent Cell & Gene Therapy

With deep experience in viral vector scale-up and production, Catalent Cell & Gene Therapy is a full-service partner for adeno-associated virus (AAV) and lentiviral vectors, and CAR-T immunotherapies. When it acquired MaSTherCell, Catalent added expertise in autologous and allogeneic cell therapy development and manufacturing to position it as a premier technology, development and manufacturing partner for innovators across the entire field of advanced biotherapeutics. Catalent has a global cell and gene therapy network of dedicated, large-scale clinical and commercial manufacturing facilities, and fill-finish and packaging capabilities located in both the U.S. and Europe. An experienced partner, Catalent Cell & Gene Therapy has worked with industry leaders across 70+ clinical and commercial programs.

ABOUT CATALENT

Catalent is the leading global provider of advanced delivery technologies, development, and manufacturing solutions for drugs, biologics, cell and gene therapies, and consumer health products. With over 85 years serving the industry, Catalent has proven expertise in bringing more customer products to market faster, enhancing product performance and ensuring reliable global clinical and commercial product supply. Catalent employs approximately 14,000 people including around 2,400 scientists and technicians, at more than 45 facilities, and in fiscal year 2020 generated over $3 billion in annual revenue. Catalent is headquartered in Somerset, New Jersey.

Never miss a pharmaceutical headline

The pharmaceutical industry moves fast – stay on top of it with our must - read briefings.

  • The top pharma and life sciences stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments driving the global pharmaceutical sector

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Latest stories

Related stories

When to Bring in Outside Help for FDA Cybersecurity Compliance (and What to Look For)

Medical device cybersecurity has become too important to treat...

Billerud Introduces New Pharmaceutical Packaging Option

Billerud has officially introduced PharmaKraft, a specialized fibre-based packaging...

AstraZeneca Advances AI Drug Discovery Deal with insitro

AstraZeneca has inked a billion-dollar AI drug discovery partnership...

Managing Quality and Regulatory Risks in Pharmaceutical Technology Transfer

Technology transfer moves more than manufacturing instructions. It moves process knowledge, supplier dependencies, labeling requirements, packaging specifications, and the evidence needed to demonstrate control. For medical device manufacturers, including those supporting drug-device combination products, these interfaces can become recurring sources of compliance gaps during site transitions, acquisitions, and remediation. The central problem is often not a missing procedure. It is a quality system that allows connected activities to change independently. A label revision may be approved while packaging artwork, supplier instructions, or production-system data still reflect an obsolete version. Staying inspection-ready requires manufacturers to manage these dependencies as one controlled system. Why Compliance Gaps Keep Recurring Findings are treated as documentation defects Revising a procedure can resolve an immediate discrepancy without changing the behavior that caused it. If unclear decision rights, weak escalation, or ineffective training remain, the same failure may surface elsewhere. Corrective and preventive action should distinguish the observed finding from its underlying cause and establish how effectiveness will be demonstrated. Ownership is divided across connected functions Quality, Regulatory Affairs, labeling, packaging engineering, operations, suppliers, and digital-system owners often maintain separate workflows. Each team may complete its assigned task while an interface remains uncontrolled. For example, changing an instruction for use can affect packaging configuration, translations, technical documentation, inventory disposition, and release controls. Transitions expose unresolved weaknesses Acquisitions and site transfers can introduce conflicting procedures, incomplete knowledge transfer, or different assumptions about validated processes. Regulatory changes add further demands. When these events coincide with CAPA or change-control backlogs, teams may prioritize administrative closure over risk reduction. Without a coordinated impact assessment, local fixes can create new gaps downstream. Establish the Regulatory Baseline Inspection readiness starts with knowing which requirements apply to the product, activity, and market. Pharmaceutical, device, and combination-product obligations are not interchangeable; transfer planning should identify the applicable requirements rather than assume one quality framework covers every operation. According to FDA’s Quality Management System Regulation overview and FAQs, the QMSR became effective on February 2, 2026, incorporates ISO 13485:2016 by reference, and introduced the updated device inspection process under Compliance Program 7382.850. ISO 13485 certification does not exempt a manufacturer from FDA inspection or guarantee compliance with FDA requirements. For devices marketed in the European Union, Regulation (EU) 2017/745, Annex I, Section 23, provides the primary requirements for information supplied with devices, including labels and instructions for use. Teams should assess the applicable provisions alongside relevant language, product-specific, and market requirements. A labeling review should therefore evaluate required content and consistency with the device’s intended purpose and supporting documentation—not merely artwork accuracy. How to Identify the Real Gaps Begin with a cross-functional assessment that follows actual product and information flows. Select representative transfers, label changes, supplier changes, and CAPAs, then trace each from initiation through implementation and effectiveness review. Map dependencies: Identify affected specifications, suppliers, packaging components, systems, validation activities, and training. Compare records with practice: Check whether approved procedures match what operators and reviewers actually do. Test traceability: Follow a requirement through technical documentation, labeling, production instructions, and release evidence. Examine recurrence: Look for repeated deviations, reopened actions, overdue changes, and findings shared across sites. Assess capacity: Determine whether qualified owners have enough time and authority to complete corrective work. Prioritize gaps by potential patient or user harm, regulatory impact, likelihood of recurrence, and detectability. Document the rationale; an old overdue item is not automatically more important than a newly identified high-risk weakness. Align Quality, Labeling, Packaging, and Change Control Create a coordinated remediation plan with one accountable owner for each action, named contributors, acceptance criteria, and required evidence. Separate immediate containment from systemic correction. Containment might prevent obsolete labels from being issued; correction might redesign approval and implementation controls so obsolete versions cannot return. Use change control as the integration point. Before approval, evaluate effects on regulatory submissions or notifications, technical documentation, supplier controls, packaging performance, validation, electronic master data, inventory, and training. Record both identified impacts and justified decisions that particular activities are unaffected. During technology transfer, define readiness gates before production or release responsibilities move. These should address the transfer of process knowledge, acceptance criteria, receiving-site capability, required qualification or validation, approved documents, and personnel competence. The appropriate evidence depends on the product and process; a generic checklist cannot replace a documented assessment. Finally, verify implementation where the work happens. Confirm that current instructions are available, suppliers received approved requirements, systems contain correct versions, and affected personnel can perform their tasks. A signed approval is not evidence that every downstream change took effect. Mistakes That Undermine Inspection Readiness Closing CAPAs on task completion alone: Effectiveness checks should test whether the underlying failure has been controlled. Updating labels in isolation: Assess packaging, supplier, system, documentation, and inventory consequences. Counting closures instead of evidence: Dashboards need defensible records behind their status indicators. ...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access theMedia Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »